Power shutdown
JAMMU, OCTOBER 09: Chief Engineer (Distribution) JPDCL Jammu has informed that the power supply to Industrial Area fed from U-Flex-II Line, Industrial Area fed from BB-2 Line shall remain affected on October 10 from 8 am to 9 am.
Similarly, the power supply to Industrial Area of SIDCO Bari Brahmana shall remain affected on October 10 from 11 am to 12 noon.