Road stretch from Rambagh bridge to AS College crossing closed
SRINAGAR, MAY 19: According to the Divisional Commissioner Kashmir, road stretch from Rambagh to Amar Singh College crossing has been closed for traffic in view of the ongoing construction of flyover.
The Div Com said that heavy machinery is to be operated and heavy building material is to be used on the road stretch as such the closure of both tubes of road for all types of vehicular traffic has been ordered with immediate effect.
He said that the step has been taken so that the construction work is carried out smoothly.
Accordingly, the Director ERA has been directed to speed up the work in flyover in triple shifts for its timely completion.